CA-1710
EXPERIENCE:
A leading Consumer Products Company, Manager
of Technology 4/2003
– Present
*
Managing all aspects of capital project associated with finishing area (22MM ) at the Swidnica, Poland Greenfield site
that are associated with the production of Oral Care products.
§ Managed
and performed conceptual and detailed engineering for the finishing area design, layouts, controls, product supply system,
COP support system and room design.
§
Managed new equipment sourcing, specification, FAT & SAT testing, installation, start up, personnel
training, and IQ, OQ, PQ Process Validation. Led company and outside contractor teams of up to 20 people.
§ Managed implementation of new
technology; Data Matrix Dual Verification (1.5MM) and SAP interfaced label print and apply systems. ( 750k)
§ Managing the relocation, upgrading
and rebuilding of existing equipment from three CP sites.
§
Managed the development of the changeover Philosophy ( based on SMED) and the choreography Bundle Book.
§ Designed and managed fabrication
of change over carts, robot trolleys, component parts storage trays, cabinets, and the layout of the pare parts room.
§ Managing the development of the
TPM Maintenance Plan and crewing.
§
Collaborated in development of the start up transition plan with line loadings, resource allocation and
timing. Managed SKU complexity reduction and determined equipment and tooling requirements.
§
Evaluated the End of Line Complexity and developed Solutions: Automatic vs. manual packing of bundles,
cases, and SRP packaging styles. Managed implementation plastic tube tray designs, plastic pallets, and slip sheets.
§ Manage and coordinate the Global
Asset Utilization Community of Practice meetings, reports, and Global conference calls.
§
Develop and manage the implementation of long-term manufacturing strategies and project priorities associated
with O.C. operations worldwide
.§ Manage
the worldwide development and implementation of technologically advanced innovative packaging systems. Global rollout of New
High Speed Toothpaste Tube Filling Lines.
§
Manage and coordinate Facility Expansion and relocation projects thru CEB Budgeting and Project write
up thru Installation and start up. Focus on finishing. Mission Hills, Mexico O.C. ( 10 MM), Huangpu, China ( 6 MM)
§ Initiated and managed A.U. increases
in our Mexico facility ( 15 pts.) and China facility ( 9 pts).
§ Propose,
Initiate, and manage upgrades to our domestic and international facilities and packaging equipment lines incorporating Company's
TPM, EME, EOHS, Quality and C&S guidelines.
§
Manage Equipment Standardization efforts worldwide.
§
Evaluate new Equipment and Processes for use with new packaging components, new products and packaging
introductions, utilizing statistical methods (MiniTab),
§
Interact and communicate daily with CP personnel in our domestic and international facilities along with
Contractors, Salespersons and Vendors.
§
Full responsibility for the professional development
of two direct reports, including performance appraisals and discipline.
Sr.
Technical Associate, PCP.
5/2001-4/2003
§ Developed and managed
the implementation of Global manufacturing and technical strategies (employing equipment standardization) associated with
PCP & Home Care finishing operations worldwide
§ Member
of the Liquids COP “Community of Practice” cross-functional team.
§
Managed and coordinated the implementation of the PCP Capital finishing projects thru CEB Budgeting /Project
write up thru Installation/Completion. Mission Hills, Mexico ILF and DSI Liquids Finishing Facility Expansion ( 15 MM), Malaysia -Moen Case Erector/Bliss
Case distribution system. (2 MM)
§ Evaluated, initiated, proposed, developed and implemented technologically advanced innovative
packaging Equipment, systems and processes for use with new packaging components, new
products and packaging introductions in our domestic and international facilities. Introduction
of Alfa labelers in Mission Hills, Mexico.
§
Interact and communicate daily with CP personnel in our domestic and international facilities along with
Contractors, Salespersons and Vendors.§ Mentor for newly hired engineer.
Technical Associate,
HSC/FC Automatic Machinery Division, Piscataway, N.J.
9/99-5/2001
§ Managed, coordinated,
and supervised implementation of Worldwide Liquids Finishing Capital projects from CEB Budgeting /write up thru Installation/completion.
Cambridge, Ohio - installation of a new liquids line generated an annual saving of $2.8MM.
§
Managed, coordinated, and supervised implementation of Worldwide Fabric Care Capital projects from CEB
Budgeting /project write up thru Installation/Completion. Kuala Lumpur, Malaysia - Powder filling line -overfill reduced to
less than 0.5% and generated an annual saving of $500M.
§
Evaluated new Equipment and Processes for use with new packaging
components, new products and packaging introductions.
§
Interacted and communicated daily with CP personnel in our domestic and international facilities along
with Contractors, Salespersons and Vendors.
§
Coordinated and supervised activities/duties of two Junior Engineers
§ Recipient of You Can Make a Difference Award
Senior
Engineer, HSC/FC Automatic Machinery Division, Piscataway, N.J. 5/97-
9/99
§ Managed, coordinated, and implemented
Worldwide Fab
ric Care Capital Finishing Projects from Project write up thru Installation/Completion. Cambridge,
Ohio Bliss Case and Generic Case Printing projects generated an annual saving of $1.5MM.
§
Evaluated new Equipment and Processes for use with new packaging
components, new products and packaging introductions.
§
Interacted and communicated daily with CP personnel in our domestic and international facilities along
with Contractors, Salespersons and Vendors.
§
Mentor for newly hired engineer.
§ Recipient of You Can Make a Difference Award – ‘Project First’
CLOROX
PRODUCTS CO., Manufacturing Engineer, Household Products, Pearl, MS.,
5/96 - 5/97
§
Managed the maintenance department (personnel, daily activities, budget, scheduling and hiring) and continuous
improvement team efforts.
§ Managed
capital Projects from budget development, project write-up to installation/completion - Custom packaging machinery.
§ Proposed, Initiated, and managed
upgrades to our Facilities, Process, filling and packaging equipment.
§
Assisted in the trouble shooting of Process, Filling, and Packaging Equipment lines
§
Evaluated new Equipment and Processes for use with new packaging components, new products and packaging
introductions.
§ Interacted
with Production, Purchasing, Package Development, Marketing, Research and Development, Corporate Engineering, Quality Control,
Accounting, Contractors, Salespeople and Vendors.
MAYBELLINE
PRODUCTS CO, INC., Senior Project Engineer, N. Little Rock, AR, 6/94
–4/96
Managed Capital Projects from Project write up thru Installation /Completion - Suzhou, China:
Researched equipment needs, designed line layouts, procured equipment and components, and managed the assembly, wiring, shipping,
and installation of the equipment.
§
Evaluated new Equipment and Processes for use with new packaging components, new products and packaging
introductions. Designed change parts and tooling for new products and packaging components
§
Assisted in the trouble shooting of Process, Filling, and Packaging Equipment lines
§
Proposed, Initiated, and managed upgrades to the Process, Filling, and Packaging Equipment lines§ Interacted with Marketing, Research
and Development, Package Development, Engineering, Production, Purchasing, Quality Control, Accounting, Contractors, Salespeople
and Vendors.
E.I.Dupont
deNemours & Co., Packaging Engineer, Remington Arms Division, Lonoke, AR. 6/92 –
6/94
§
Managed capital Projects from Project write-up, Design, development and Installation/Start up-Three custom
dry offset carton printing systems. Installation of a robotic cartoning machine
§
Managed, Coordinated, and created the Art for Printing plates used on the Four Color Dry Offset Folding
Carton and Shell Printers
§ Managed the development, design, and creation of primary and secondary packaging components,
samples, drawings, specifications, packaging graphics, separations and final film. §
Reviewed, Proposed, Initiated, and Managed the Upgrades to the Packaging Equipment Lines
§ Assisted in the trouble shooting
of Packaging and Printing equipment lines
§
Interacted with Marketing, Research and Development, Engineering, Production, Purchasing,
Quality Control, Accounting, Contractors and Vendors/Salespeople
§
Supervised the Packaging Department Employees and engineering technician and managed the Packaging and
drafting department budgets.
Tyco Toys, Inc., Packaging Engineer - Assistant. Manager of Packaging Engineering,, Mt. Laurel, N.J.
9/89 - 6/92
§
Interacted with Marketing, Product Development, Engineering, Purchasing,
Quality Control, Creative Services, the Graphic Arts and Production Departments, Overseas Installations and Salespeople and
Vendors
§
Managed the development and design of primary and secondary packaging
components, drawings and specifications.
§
Managed and Coordinated the Production of Pkg. Samples for the Marketing
presentations, the Toy Fair Trade Show and our Sales Offices
§ Developed Toy packaging procedures for our Domestic and Overseas Installations
§ Reviewed, Proposed, Initiated, and Managed Upgrades to the Packaging Equipment Lines
§ Assisted in the evaluation/Selection of an E.D.I. Barcode Labeling System
§ Supervised the Packaging Department Employees
EDUCATION:
B.S.
Mechanical Engineering, University of Delaware, Financed 100% of Degree, June
1989
Qualifications:
* Extensive knowledge and experience with Packaging Materials, Manufacturing Systems and machines,
and
Controls.
* Extensive Project Engineering Experience in the Development
of Consumer Products. Packaging and the Installation of Packaging, Process, and Material Handling Equipment.
* Innovative ‘Out of the Box’ problem solver and creative individual
* Experience with many Computer Systems and programs
* Basic, Pascal, and FORTRAN 77 Programming Language Experience
* Excellent Professional and Interpersonal Skills